Enikon signs a contract with Iacovou Brother for the Petrolina Tank Farm project on Cyprus. Enikon’s scope of work covers design, supply and installation of 8 tanks and the fire fighting system. The project is scheduled to be finished in 18 months. The prefabrication of tanks and piping is to be performed in Enikon’s Kutina Workshop.