Najznačajniji projekti
Projekt izgradnje rudnika zlata Buzwagi, Tanzanija
Saznajte više

Projekt izgradnje rudnika zlata Buzwagi, Tanzanija

U veljači 2008. Enikon je potpisao ugovore s Barrick Gold-om, vodećim svjetskim proizvođačem zlata (kroz svoju tvrtku Pangea Minerals), za projektiranje, isporuku i izgradnju spremnika i SMP paketa na projektu izgradnje rudnika zlata u Buzwagiju, Tanzanija.
Projekt izgradnje sportske dvorane Arena Zagreb, Hrvatska
Saznajte više

Projekt izgradnje sportske dvorane Arena Zagreb, Hrvatska

U svibnju 2008. Enikon je potpisao ugovor za projektiranje, isporuku i izgradnju viseće krovne konstrukcije na Areni Zagreb, na principu ključ u ruke. Svoje ugovorne obaveze na projektu izgradnje Arene Zagreb Enikon je završio u rekordnom roku i Arena je otvorena prema planu, u prosincu 2008., za Svjetsko rukometno prvenstvo.
Projekt izgradnje rudnika zlata Agbaou, Obala Bjelokosti
Saznajte više

Projekt izgradnje rudnika zlata Agbaou, Obala Bjelokosti

U veljači 2013. Enikon je potpisao ugovore s Endeavour Miningom, jednim od najbrže rastućih svjetskih proizvođača zlata, za izgradnju vijčanih spremnika, čeličnih zgrada i SMP paketa u rudniku zlata Agbaou u Obali Bjelokosti. Ovo je treći ugovor sklopljen za radove u zapadnoj Africi, a u sklopu strategije širenja na tom brzorastućem tržištu.
Projekt proširenja rudnika bakra Lumwana, Zambija
Saznajte više

Projekt proširenja rudnika bakra Lumwana, Zambija

U studenome 2011. Enikon je potpisao ugovore s Lumwana Mining Company, tvrtkom u vlasništvu Barrick Golda, za projektiranje, isporuku i izgradnju spremnika, čelične konstrukcije i kanala, te montažu cjevovoda, mlina i ostale strojarske opreme na projektu proširenja rudnika bakra u Lumwani, Zambija.

Preporučuju nas

Kvalitetu našeg rada najbolje opisuju naši klijenti

  • We hereby certify that Enikon Zagreb has performed the following works: diesel storage tank, petrol storage tank, loading pump station, fire fighting pump station and many more. The above works have been carried out in accordance with API-650 with fine workmanship and within the contracted period. We are highly satisfied with their quality standards and performance.
    R. Stock, Lahmeyer International GmbH
  • This letter is to confirm that Enikon (Zambia) LTD recently completed the tank fabrication, mechanical works and structural works for the new fuel depot at Lumwana. Enikon completed all the works successfully in terms of quality of workmanship and with an excellent safety record. We would recommend Enikon for any similar type of work.
    G.M.E. Kerr, Kantey & Templer
  • This is to confirm that ENIKON LTD is a company specialised in construction of Petro Chemical and Oil industries and as such has performed construction of the following facilities for BP (Tanzania) Ltd: Moshi Depot Re-development Project; Tank Farm: Civil works, Supply and erection of piping, Material, steel structures and electrical equipment. Erection of 7 Nos. storage tanks. Loading/offloading stations. Pump station. Fire lighting system, piping works. Corrosion protection works. Supply and erection of Loading arms. All Projects were completed between 1999 and 2002. Projects were completed on time with good quality performance and we can recommend Enikon for similar projects.
    For BP Tanzania ltd, Telesphory Malibate, Project & Management Engineer
  • Dear Sirs. This is to confirm that Messrs Enikon Ltd Construction Company, Zagreb, Croatia have performed the construction of a Crude Oil Tank, capacity 80.000 m3 for us at the Project JANAF Pipeline Croatia, Fuel Depot Omišalj. The project, executed on turn-key basis, was compleed on time from 2002 to 2003 year in accordance with AP1-650 with excellent quality performance. The tank was a floating roof (double deck) pontoon type, including fire fighting piping systems and tank fittings. We, as an Engineering Company can recommend Enikon d.d. as a reliable contractor for similar projects.
    Đuro Đaković Engineering Company d.d., Davorin Tekić B.SC.Mech.Eng., president
  • This is to confirm that ENIKON Ltd, Construction Company have performed the refurbishement of 3 crude oil storage tanks (capacity: 40.000 cm each) for us, at TAZAMA tank farm. Dar Es Salaam. Tanzania. The Project was executed on time from 1999 to 2000 with very good quality performance and therefore we can recommend Enikon Ltd, Construction Company to any client in need of constructing new tanks.
    M. Ripoche, Project Manager, Agintis
  • Dear Sirs, This is to confirm that Enikon Ltd. Construction Company, Zagreb, Croatia have performed for our Project Dhekelia Cyprus 2 - design, manufacturing and erection of tanks as follows: HFO Buffer tank 520 m3; HFO Service tank 90 m3; Sludge storage tank 50 m3; Sludge storage tank 50m3; DO Service tank 100 m3; Waste lube oil storage tank 50 m3; Lube oil storage tank 50 m3. The project executed on turn-key basis, was completed in 2009 year in accordance with API650 with salifactory quality performance. We, as an Engineering & Construction Company can recommend Enikon as a reliable contractor for similar projects.
    Burmeister & Wain Scandinavian Contractor A/S
  • This is to confirm that the Buzwagi Project was Constructed near Kahama Tanzania between July 2007 and June 2009. Lycopodium Minerals were the EPCM Engineers for the works, which were completed for the project owner, Pangea Minerals Limited (a wholly owned subsidiary of Barrick Gold, now African Barrick Gold). This is to confirm that Enikon Ltd. Construction Company, Zagreb, Croatia was awarded the Field Erected Tank package which involved manufacture and installation of 30 different tanks with cumulative capacity of 27,836 m3. The project was executed on a turn-key basis and completed in 2008. Tank design was in accordance with API650. The Buzwagi Project was a success and delivered to the cost and time targets set by the project owner. As a measure of Enikon's contribution to the success of Buzwagi, the company was awarded further works at Buzwagi and has also been awarded subsequent work on other Lycopodium controlled projects. Further information can be obtained by contacting the undersigned.
    James McDonald, Project Manager, Lycopodium Minerals
  • Mbeya Cement Kiln shell replacement and separator erection; I would like to commend your team who did a good, well organised, safe and efficient job. They also worked in good co-operation with our staff and our contractors. I hope that we can work together again in the future.
    James Kirkpatrick, Plant Manager, Mbeya Cement
  • This is to confirm that Enikon Ltd, Construction Company, Zagreb, Croatia have performed for our Project TAZAMA Tank Farm, Tanzania - design, manufacturing and installation of three (3) tanks in tanks capacity of 40,000 m3 each and total capacity of 120,000 m3 for three tanks. The project executed on turn-key basis, was completed in 2005 year in accordance with API650 with excellent quality performance. We, as an Engineering Company can recommend Enikon as reliable Contractor for similar projects.
    Abraham Saunyama, Regional Manager, Tazama Pipelines Limited

Novosti

POGLEDAJ SVE -
Enikon - Duga tradicija, bogato iskustvo diljem svijeta, kvaliteta, poštivanje rokova
NA VRH